COST AND DECISION GUIDE

Website Delivery Process: Step-by-Step Guide from Brief to Live

End uncertainties, surprise delays, and communication breakdowns: The transparent 5 phases of a web project at Alaska Medya, from the ideation stage to turnkey launch.

Update: October 2026
Standard Duration: 10 - 15 Business Days
Milestone-Based Written Approval System
Brief'ten yayına 5 aşamalı web sitesi teslim süreci zaman çizelgesi

A Disciplined Process: The Only Cure for Delays and Surprises

The most common problem companies face in the web design industry is that delivery promises made at the start of the project are not kept, and projects drag on for months. Since many agencies do not divide the process into clear steps, they get caught in a vortex of revisions and fail to manage the delivery schedule. Thanks to our transparent web design process implemented as Alaska Medya, we commit to our clients on which day they will receive which deliverable, preventing surprise delays.

A successful website does not happen by chance; it requires a solid needs analysis, user experience (UX) testing, clean coding architecture, and the flawless execution of deployment protocols. At Alaska Medya, we share the 5-step process in all its stages, from the initial discovery call to the day your site welcomes its first visitor.

Our Core Guarantee: No phase moves to the next without your written approval. We never start coding without approving the design, and we never launch your site without completing tests.

5-Step Delivery Schedule and Responsibility Matrix

The timeline and deliverables for our standard corporate web design project, which takes 10 to 15 business days:

Phase & Time Work Performed & Deliverables Approval & Milestone
Phase 01 (Days 1 - 2) Discovery & Scope Industry analysis, target audience identification, clarification of sitemap and information architecture. Completion of Scope Document and Written Contract Signature
Phase 02 (Days 3 - 6) UI/UX Interface Design Preparation of brand-specific homepage and subpage wireframes and user interface (UI) designs on Figma, typography and color selection. 2 Rounds of Revision and Design Approval via Live Figma Link
Phase 03 (Days 7 - 11) Front-End & Panel Coding Lightweight and clean coding of the approved design in a project-appropriate infrastructure (WordPress or custom coding), mobile responsiveness, and English/Turkish management panel integration. Working Preview Presentation on Staging Server
Phase 04 (Days 12 - 13) Content, Testing & SEO Uploading corporate texts and products, speed optimization targeting PageSpeed 90+, TLS (SSL) certificate / HTTPS and Schema coding. Mobile, Form and Cross-Browser Compatibility Test Approval
Phase 05 (Days 14 - 15) Training & Go-Live Providing management panel training to the company team, DNS redirection, corporate email migration and going live. Transfer of Financial Rights for Code and Content, Delivery of Panel Access Credentials

From Brief to Live Broadcast: Anatomy of Core Phases

PHASE 01

1. Discovery, Target Analysis and Scope Definition

The project starts by listening to your company. Which products will be highlighted, your target audience's purchasing reflexes, and your competitors' shortcomings are analyzed. The number of pages, form functions, and delivery date are bound by a written contract.

PHASE 02

2. Unique UI/UX Interface Design with Figma

A color palette matching your corporate identity, readable modern typography, and conversion-optimized (CRO) button placements are designed in Figma. Draft screens are presented as an interactive prototype; coding does not begin without your approval.

PHASE 03

3. Clean Coding and Easy Management Panel

Coding is performed with a lightweight architecture stripped of unnecessary loads, in an infrastructure appropriate to the project (WordPress or custom coding). A management panel is connected to ensure pages can be easily edited.

PHASE 04

4. Performance, Core Web Vitals and Technical SEO

Your site is moved to a test server and subjected to the Google PageSpeed test. In line with the PageSpeed 90+ target, WebP/AVIF image compression is performed; SPF/DKIM/DMARC email records and Schema.org semantic structured data are set up.

PHASE 05

5. Training and Go-Live

Management panel training is provided to your company team. DNS redirection and corporate email migration are carried out in a planned manner, your site is published, and the financial rights to the custom code and content along with panel access information are delivered to you.

Planned and Transparent Project Management for Corporate Companies

As Alaska Medya, in our turnkey corporate website projects that fully respond to your company's operational needs—ranging from industrial manufacturers to e-commerce startups—we transfer the financial rights of the custom code and content to you. Throughout the project, you deal directly with the technical manager via a WhatsApp group and weekly video meetings.

Once delivery is complete, you will not encounter any out-of-contract hidden costs; the corporate package includes the first year of hosting, corporate email, domain name, and maintenance/support, while the TLS (SSL) certificate is free. VAT is added separately to the prices.

4 Golden Rules to Prevent Delays in Web Projects

The business discipline we mutually apply to ensure the delivery schedule runs smoothly:

RULE 01

Timely Content Delivery

When your company's product photos, catalogs, and corporate profile are shared within the first 5 days of the project, the design flow is not interrupted.

RULE 02

Designation of a Single Authorized Contact

Appointing a single decision-making project manager from your company prevents conflicting revision requests from different executives.

RULE 03

Written Phased Approval Mechanism

Requesting no ground-up design changes during the coding phase once the Figma design is approved protects the delivery schedule.

RULE 04

Clear Scope Boundaries

Instead of trying to add massive out-of-contract new software modules mid-project, planning these requests as Phase 2 ensures the main site goes live on time.

Standards You Must Put on the Table Before Starting the Project

Having a successful delivery process is possible with the right infrastructure choice and contract discipline. Before starting the process, you can review our things to consider when having a website built guide on which rights you need to guarantee in the contract and critical details in infrastructure selection.

}

Frequently Asked Questions About the Website Delivery Process

Operational details our clients wonder about most at the project kickoff:

A standard corporate website is delivered in an average of 10 to 15 business days, including scoping, Figma design, coding, content entry, and testing. For special occasions such as trade fair participations or urgent product launches, a prioritized development plan can be created based on the scope and content preparation.
Yes. As Alaska Medya, we apply a phased approval system. You have the right to 2 rounds of comprehensive design revisions during the Figma interface stage. Coding begins only after the design receives your full approval. Following delivery, text, image, and minor layout updates are carried out within the scope of the first-year maintenance.
This risk is minimized through a planned migration. Corporate email boxes on your old site are migrated to the new hosting infrastructure with a plan that minimizes downtime. Your old page URLs that have rankings on Google are transferred to the new pages using 301 permanent redirects, thus minimizing the risk of organic traffic and ranking loss.
Yes. Before your website goes live, one-on-one Turkish panel usage training is provided to your company's authorized personnel (secretariat, marketing, or IT officer) via Google Meet or face-to-face at our Kartal office. In addition, a special video guide explaining how to use the panel step-by-step is delivered as an archive.
ENGINEERING AND CONSULTING

Let's Determine the Right Strategy for Your Project Together

Talk to our technical team to find out which infrastructure suits your business model and get a quote meeting current standards.